Kamis, 31 Maret 2016

The Everything Got Changed Video

Well, we managed to do all sorts of work this weekend:
  • Took down the large grow bed, cut the table legs down, and refilled it with new gravel.
  • Installed a second large grow bed and changed the gravel in the bath tub grow bed.
  • Dug a hole for our sump tanks. These are two interconnected "blue" barrels.
  • Built a steel, lockable lid for the valuable equipment area.
  • Built a swirl filter and stand.
  • Reconfigured the pump to function out of the sump, from where it fills the tank and the grow beds, in a "CHOP Mark 2" setup.
In all, too much to write about, so I made a video:


The PH will probably take some time to come down. It hasnt yet. Ive added lemons and will add a few a day until it does. And if this gravel turns out to also be bad, I just might put myself in the sump tank and bury myself in it! I tested it first, so this unusual AP maneuver should not be necessary.

Ill fix the problem with the overflow system next week. Im also glad I can now route the drain pipes around the outside of the grow beds. I can walk up and down and across the greenhouse and between beds without worrying about pipes.

Related Posts by Categories

0 komentar:

Posting Komentar